Skip to main content

PG&E 2025 Potter Valley Project Operations

2025 Minimum Instream Temporary Flow Amendment Request

Updated 2/14/25:

PG&E has submitted a temporary license flow amendment (previously referred to as a temporary flow variance) to the Federal Energy Regulatory Commission (FERC) for the Potter Valley Project 2025 operations.

2025, 2-14 PG&E 2025 Flow Variance Request to FERC.pdf

The request seems to be identical to the 2024 Flow Variance Request that as granted by FERC (website page linked at right.)

Join our mailing list